Concrete placing boom

Concrete placing boom

HG28

REQUEST A QUOTE

You have choose: Concrete placing boom - HG28

See the verification code Click refresh!

BROCHURE DOWNLOAD|SALES NETWORK

  • FEATURES
  • PARAMETERS
HG28

Application

Self-climbing type, climbing by floor frame or by shaft frame. Mainly used for concrete placing of construction project, including civil construction, plant construction, bridge construction, beam yard, nuclear power plant, infrastructure, etc.

Charactics

□  Modular design, mechanical and electrical integration control, folding boom, tube column, floor frame and shaft frame. Integration of advanced features and product diversification, to achieve a higher product portfolio, improve the applicability of the product.

□  Imported hydraulic and electrical components, adopt quality fast coupling for hydraulic pipelines, which is converted quickly,  it can effectively solve the problem of oil leakage in the process of  assemblying and dismantling, and avoid the pollution of the environment. Safety and reliability

□  3 sections R type hydraulic boom, large circular arc, novel and beautiful appearance, compact structure, and the lightweight design of the boom, which reduced the weight of the whole machine..

□  Easy to transport and install.


Model 

HG28

Delivery pipe dimension (outside diameter × thickness) (mm × mm

Φ133×4

Delivery hose dimension (inside diameter × length) (″×mm

5″×3000

Radius of placing boom (m)

27.7

Stationary height (to the joint between the end of the boom and Swivel table) (m)

22.9

Three hydraulic foldable arms

1st section

10.5m

2nd section

9.2m

3rd section

8.0m

Boom articulation

1st section

-4.2°~+82.5°

2nd section

0°~180°

3rd section

0°~180°

Slewing range (°)

360

Power of motor (kW)

11

Pressure of hydraulic system (MPa)

28

Type of hydraulic oil

ESSO NUTO H46

Interval of climbing frame (m)

Climbing

3.0~4.2

Placing concrete

6.0~8.4

Resting

Mode of operation

1. cable remote control

2. radio remote control

Power

380V/50Hz

wind speed

Placing concrete

≤60 km/h

Climbing

≤28 km/h

working temperature

0~48℃